2.2 Install the Switch

This section describes how to install your Industrial Managed Switch and make connections to the Industrial Managed Switch.
Please read the following topics and perform the procedures in the order being presented. To install your Industrial Managed
Switch on a desktop or shelf, simply complete the following steps.

2.2.1 Desktop Installation

To install the Industrial Managed Switch on desktop or shelf, please follows these steps:
Step1: Attach the rubber feet to the recessed areas on the bottom of the Industrial Managed Switch.
Step2: Place the Industrial Managed Switch on the desktop or the shelf near an AC or DC power source, as shown in Figure
2-4.
Step3: Keep enough ventilation space between the Industrial Managed Switch and the surrounding objects.
When choosing a location, please keep in mind the environmental restrictions discussed in Chapter
1, Section 4, and Specification.
Step4: Connect the Industrial Managed Switch to network devices.
Connect one end of a standard network cable to the 10/100/1000 RJ-45 ports on the front of the Industrial Managed Switch
Connect the other end of the cable to the network devices such as printer servers, workstations or routers...etc.
Connection to the Industrial Managed Switch requires UTP Category 5, 5e or 6 network cabling with
RJ-45 tips. For more information, please see the Cabling Specification in Appendix A.
Step5: Supply power to the Industrial Managed Switch.
Connect one end of the power cable to the Industrial Managed Switch.
Connect the power plug of the power cable to a standard wall outlet.
When the Industrial Managed Switch receives power, the Power LED should remain solid Green.
Figure 2-4 Place the Switch on the desktop