PIAGGIO MP3 530 hpe Service Station Manual page 157

Hide thumbs Also See for MP3 530 hpe:
Table of Contents

Advertisement

Machine Translated by Google
Motor
- The current continuity between the 3 phases
check.
ANNOTATION
THE VALUES STATED REFER TO MEASUREMENTS AT ROOM
TEMPERATURE. WILL BE THE STATOR
CHECKED AT OPERATING TEMPERATURE, HIGHER THAN
THE STATED VALUES ARE MEASURED.
Electrical information
Resistance:
0.2 ÷ 1 ÿ
- Check that each phase is iso to ground
is latched.
- If different values are measured, this must be done
the cabling must be checked carefully. The
Wiring consists of 2 different cables
beln: Stiff cables near the stator and
soft cables up to the cable connector.
- Check that the windings are properly attached
are that they are the heads of the fastening screw
Don't touch Ben.
Installation of the stator
- Install the stator and the 3 fasteners
screw with the specified torque
ment tighten.
ANNOTATION
THE RUBBER SEALING OF THE CABLE BUNDLE MUST BE IN
THE APPROPRIATE SEAT WILL BE PLACED ON THE
HOUSING.
Torque guide values (N*m)
Fasteners stator 8 - 10
AGAINST - 160
MP3 530 hpe

Advertisement

Table of Contents
loading

Table of Contents