Figure 123: Holding An Fpc Vertically - Juniper Core Router T Series Hardware Manual

Hide thumbs Also See for Core Router T Series:
Table of Contents

Advertisement

See Also
Copyright © 2018, Juniper Networks, Inc.
You hold an FPC vertically when installing it into the chassis or an equipment rack. To
hold an FPC vertically (see
Orient the FPC so that the faceplate faces you.
1.
Place one hand around the FPC faceplate about a quarter of the way down from the
2.
top edge. To avoid deforming the electromagnetic interference (EMI) shielding strip,
do not press hard on it.
Place your other hand at the bottom edge of the FPC. If the FPC has heat sinks about
3.
midway between the faceplate and connector edge, place your other hand against
the heat sinks.

Figure 123: Holding an FPC Vertically

T320 Flexible PIC Concentrators (FPCs) Description on page 61
Troubleshooting the T320 FPCs on page 301
Figure 123 on page
281):
Chapter 31: Maintaining Components
281

Advertisement

Table of Contents
loading

This manual is also suitable for:

Core router t320

Table of Contents