CHAPTER 16
Installing the T320 into a Rack
Overview of Installing the T320 Router into a Rack
Copyright © 2018, Juniper Networks, Inc.
Overview of Installing the T320 Router into a Rack on page 121
Verify that the following tasks have been completed before installing the router in a rack:
Verify that all the tasks required to prepare the site for router installation have been
1.
completed.
See
"T320 Site Preparation Checklist Requirements" on page
Review the safety information.
2.
See
"T320 Installation Safety Guidelines" on page 335
for Juniper Networks Devices" on page
NOTE:
To avoid harm to yourself or the router as you install and maintain
it, follow the guidelines for working with and near electrical equipment,
as well as the safety procedures for working with routers. However,
providing an exhaustive set of guidelines for working with electrical
equipment is beyond the scope of this documentation.
Remove the router from the shipping crate.
3.
See
"Unpacking the T320 Router" on page
Install the mounting hardware.
4.
See
"Installing the T320 Mounting Hardware for a Four-Post Rack or Cabinet" on
page 117
or
"Installing the T320 Mounting Hardware for an Open-Frame Rack" on
page 115
Because of the T320 router's size and weight—up to 370 lb (168 kg) depending on the
configuration—we strongly recommend that you install the router using a mechanical
lift, as described in
"Overview of Installing a T320 Router Using a Mechanical Lift" on
page
123.
89.
and
"General Safety Guidelines
327.
109.
121