Figure 111: Holding An Fpc Vertically - Juniper MX240 Hardware Manual

5g universal routing platform
Hide thumbs Also See for MX240:
Table of Contents

Advertisement

MX240 5G Universal Routing Platform Hardware Guide
See Also
268
You hold an FPC horizontally when installing it into the chassis or an equipment rack. To
hold an FPC vertically (see
Orient the FPC so that the faceplate faces you.
1.
Place one hand around the FPC faceplate about a quarter of the way down from the
2.
top edge. To avoid deforming the electromagnetic interference (EMI) shielding strip,
do not press hard on it.
Place your other hand at the bottom edge of the FPC. If the FPC has heat sinks about
3.
midway between the faceplate and connector edge, place your other hand against
the heat sinks.

Figure 111: Holding an FPC Vertically

MX240 FPC Terminology
Storing an MX240 FPC on page 269
Figure 111 on page
268):
Copyright © 2019, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents