CBE20 – Communication Board Ethernet (option G33)
Table 10-9
Description of the LEDs on the CBE20
LED
Color
Link port
---
Green
Activity
---
port
Yellow
Fault
---
Red
Sync
---
Green
OPT on
---
the Control
Unit
Green
Red
Drive converter cabinet units
Operating Instructions, 07/07, A5E00288214A
State
OFF
The electronics power supply is missing or lies outside permissible
tolerance range.
Steady light
A different device is connected to port x and a physical connection exists.
OFF
The electronics power supply is missing or lies outside permissible
tolerance range.
Steady light
Component active (DC link discharge via braking resistor in progress).
OFF
If the link port LED is green:
The CBE20 is operating normally, data is being exchanged with the
configured IO Controller.
Flashing
- The response monitoring time has elapsed.
- Communication has been interrupted.
- The IP address is incorrect.
- Incorrect or missing configuration.
- Incorrect parameterization.
- Incorrect or missing device name.
- IO Controller not present/switched off but Ethernet connection present.
- Other CBE20 errors
Steady light
CBE20 bus fault
- No physical connection to a subnet/switch.
- Incorrect transmission rate.
- Full-duplex transmission not activated.
OFF
If the link port LED is green:
Control Unit task system is not synchronized with the IRT clock. An
internal substitute clock is generated.
Flashing
Control Unit task system has synchronized with the IRT clock and data is
being exchanged.
Steady light
Task system and MC-PLL have synchronized with the IRT clock.
OFF
Electronic power supply is missing or outside permissible tolerance
range.
Communication Board either defective or not inserted.
Steady light
Communication Board is ready and cyclic communication is taking place.
0.5 Hz flashing
The Communication Board is ready, but cyclic communication is not yet
light
taking place.
Possible causes:
- At least one fault is pending.
- Communication is being established.
Steady light
Cyclic communication via PROFINET has not yet been established.
However, acyclic communication is possible. SINAMICS is waiting for a
parameterization/configuration telegram.
0.5 Hz flashing
The firmware download to the CBE20 has failed.
light
Possible causes:
- The CBE20 is defective.
- The CompactFlash card for the Control Unit is defective.
In this state, the CBE20 cannot be used.
Diagnosis / faults and alarms
Description
10.2 Diagnosis
415