Siemens SINAMICS S150 Operating Instructions Manual page 159

Converter cabinet units 75 kw to 1200 kw
Hide thumbs Also See for SINAMICS S150:
Table of Contents

Advertisement

Once the system has successfully ramped up, the drive has to be commissioned when the
system is switched on for the first time after it has been delivered. The converter can then be
switched on.
When the system is then ramped up again, it can be operated immediately.
Navigation within the interactive screens
Within an interactive screen, the selection boxes can usually be selected using the <F2>
and/or <F3> keys. Selection fields are generally texts surrounded by a frame. When they are
selected, they are highlighted with a white text on a black background.
The present value of a highlighted selection box can usually be changed by pressing <F5>
"OK" and/or "Change". Another entry box then appears and the value you want is entered
directly using the numerical keypad or can be selected from a list.
You can change from one interactive screen to the next or previous screen by selecting the
"Next" or "Previous" selection boxes and then confirming by pressing <F5> "OK".
If a screen contains particularly important parameters, the selection field "Continue" only
appears at the bottom of the screen. This is because every single parameter in this
interactive screen has to be checked and/or corrected thoroughly before the next interactive
screen can be accessed.
Drive converter cabinet units
Operating Instructions, 07/07, A5E00288214A
Commissioning
5.5 First commissioning
159

Advertisement

Table of Contents
loading

Table of Contents