Omron FH-1 series User Manual page 102

Hide thumbs Also See for FH-1 series:
Table of Contents

Advertisement

4 Setting the Controller
Setting Item
Operation priority
Measurement initialization prior-
ity
Measurement priority
Relocate memories
4 - 4
Set value
[Factory default]
Selects the operation priority to either measurement
results display or menu operation.
[Measurement
Processing of measurement results display is given pri-
result priority]
ority. Menu operation will be harder to receive because
of its lowered priority status.
Menu operation
Menu operation is given priority. Measurement results
priority
display may be incomplete.
Measurement initialization is performed immediately
after changing the scene or editing the flow. You can
specify whether measurement trigger reception or dis-
play refresh processing has priority during measurement
initialization.
When the "Manual Position Setting" processing unit is
set in the measurement flow, an action when the "Pro-
cessing of redrawing on screen priority" is set up is per-
formed regardless of the settings.
[Measurement
Measurement trigger reception is given priority even
trigger receipt pri-
during measurement initialization processing. Displays
ority]
for display refresh processing may be incomplete
because of its lowered priority status.
Processing of re-
Processing of refreshing the display is given priority.
drawing on screen
Measurement triggers will not be received until display
priority
refresh processing is completed.
Specify whether the processing priority is Measurement,
or Communication.
[Run the measure-
Measurement processing is the highest priority.
ment process as
This setting is normally recommended.
the top priority]
Communication processing is higher priority. Communi-
Lower the priority
of the measure-
cation is given higher priority even if measurement pro-
ment process.
cessing runs with high-load. Therefore, measurement
processing time will be longer.
This setting is beneficial when a missed data is occurred
due to no handshake communication on EtherNet/IP.
Select the relocate processing.
[Relocate]
Relocate processing is executed.
More units can be registered to one Scene group
because this function improves the memory efficiency.
• At startup.
• When the Scene group is selected.
• When the Processing Unit is added.
• When Scene or Processing Unit is copied.
• When scene data, such as registered, or re-registered
Model, or Measurement region is changed.
It is normally recommended to use [Relocate].
Do not relocate
Relocate processing is not carried out.
Set this setting when Relocate processing takes long
time.
Vision System FH/FHV/FZ5 Series User's Manual (Z365)
Description
(*1)

Advertisement

Table of Contents
loading

Table of Contents