4
Integration
Baseline Allocation
The exponential model is fitted through the part of the tail of the parent peak
immediately before the first child peak.
corrected curve of a child peak after tangent skimming.
Figure 21
Front Peak Skimming
As for child peaks on the tail of a parent peak, special integration is required
for some peaks on the front/upslope of a peak, see
Figure 22
Front peak skimmimg is treated the same way as tail peak skimming, using the
same skim models.
The skim criteria are:
• front skim height ratio
• valley height ratio
98
Tail-corrected child peak
Front peak skimming
Figure 21
on page 98 shows the
Figure 22
Understanding Your Agilent ChemStation
on page 98.