Disable Scheduled Maintenance; Check For Translation Corruption; Stop The Lsps (If Applicable) - Avaya G700 Installation And Upgrades

Hide thumbs Also See for G700:
Table of Contents

Advertisement

6
Upgrading an Existing G700 with an S8300 — R2.0 to R2.x
On-site Preparation for the Upgrade

Disable Scheduled Maintenance

To prevent scheduled daily maintenance from interfering with the upgrade:
1
At the SAT prompt, type change system-parameters maintenance and press
2
If scheduled maintenance is in progress, set the Stop Time field to 1 minute after the current
time.
or
If scheduled maintenance is not in progress, set the Start Time field to a time after the
upgrade will be completed.
For example, if you start the upgrade at 8:00 P.M. and the upgrade takes 90 minutes, set the
Start Time field to 21:30.

Check for Translation Corruption

1
At the SAT prompt, type newterm and press
2
Enter your terminal type and press
If you see the following message:
escalation procedure for translation corruption before continuing the upgrade.

Stop the LSPs (if applicable)

Skip this procedure if no LSPs are registered to the S8300.
For configurations with LSPs, the LSPs and the primary controller (S8300, S8500, or S8700) must run
the same version Communication Manager. Therefore, an upgrade to an LSP is usually accompanied by
an upgrade of the primary controller. You should upgrade the LSP before you upgrade the primary
controller.
Before you upgrade the primary controller, you need to shut down Communication Manager on the LSPs.
This prevents the phones and other endpoints attached to the G700 from trying to register with the LSPs
while you are upgrading the primary controller.
To stop Communication Manager on an LSP:
1
Open a telnet session on the S8300 (LSP).
2
Telnet to the LSP.
3
At the command line, type stop -acfn and press
The S8300 (LSP) shuts down Communication Manager.
After the primary controller has been upgraded, you need to restart the LSPs.
272
Enter
Warning: Translation corruption found,
CAUTION:
The LSP's Communication Manager must remain shutdown while you upgrade the
primary Controller. When you complete the primary controller upgrade, run save
translation on the primary controller before restarting Communication Manager on the
LSP. The save translations process will automatically cause the G700's endpoints to
reregister with the primary controller.
Enter
.
.
.
Enter
Installation and Upgrades for G700 and S8300
Enter
.
then follow the normal
December 2003

Advertisement

Table of Contents
loading

This manual is also suitable for:

S8300

Table of Contents