•
Once the drive is properly configured, the program begins installing Communication Manager
software and reports the progress.
•
These processes take 15–20 minutes. When the media server is ready to reboot, the CD drive door
opens and the following screen flashes for about 5 seconds. At this point, you are finished with
the CD and CD drive.
NOTE:
In this screen, "latest updates to software" refers to the latest software updates (patches).
See
Download Software Update (patch) file to Your Laptop, if Necessary
When the installation process is complete, the system reboots automatically. The reboot takes 1–3
minutes.
Installation and Upgrades for G700 and S8300
December 2003
Upgrading an Existing G700 with an S8300 — R1.x to R2.0
5
Upgrade the S8300
on page 216.
235