Upgrade An Existing G700 With An S8300 (R1.X To R2.0); Checklist 3 - Avaya G700 Installation And Upgrades

Hide thumbs Also See for G700:
Table of Contents

Advertisement

1
Roadmap and Reference
Installation Roadmap and Task Lists

Checklist 3

Upgrade an Existing G700 with an
S8300 (R1.x to R2.0)
Use the following checklist to upgrade a G700 Media Gateway with the following characteristics:
The G700 has an S8300 Media Server configured as the primary controller.
or,
The G700 has an S8300 Media Server configured as an LSP and is controlled by either an S8300,
S8500, or S8700 Media Server.
You will use Chapter 5 with this checklist. For help with connecting to and logging in to the G700 or
S8300, see
Table 3: Task List to Upgrade an Existing G700 with an S8300 (R1.x to R2.0)
Major Tasks
Before Going to the Customer Site
page 214
On-site Preparation for the Upgrade
on page 219
40
Connection Methods
in this chapter.
on
Subtasks
- Get the USB CD-ROM drive
- Fill in EPW (if upgrading from 1.1)
- Get planning form
- Get the G700 serial number
- Check number of allocated ports
- Check FTP server for back up
- Get software/firmware files
- Download update (Patch) software to laptop, if necessary
- Complete the RFA process
- Check current software release
- Pre-Upgrade tasks — If the Target S8300 is the Primary
Controller
- Get IA770 data and stop IA770
- Back up recover system files
- Record configuration information
- Install the pre-upgrade update
- Back up the system files
Installation and Upgrades for G700 and S8300
1 of 2
December 2003

Advertisement

Table of Contents
loading

This manual is also suitable for:

S8300

Table of Contents