Port status
inact
(a) Cause and handling of the faulty port status
When
faulty
As shown in Table 13-31 Port status and the triggers of status transition, the main causes of
port status are as follows:
faulty
An overload is detected.
Abnormality of the temperature of the PoE controller is detected.
Other PoE abnormality is detected.
To resume power supply to the relevant port, execute the
operation command.
(b) Cause and handling of the denied port status
When
denied
Switch is insufficient, power supply to the relevant port is being stopped.
Use the
show power inline
the entire Switch and the total amount of power supplied to the entire Switch, and use
configuration to set the appropriate amount of power to be allocated or check the
connection configuration of PDs.
When the shortage of power supply of the entire Switch is resolved, the port status
is no longer displayed.

13.10.6 Notes on PoE usage

(1) Setting for manual power allocation
When specifying manual allocation settings, read the documentation for the
power-receiving device. The customer performs the operation at the customer's own risk.
Set a value for the maximum power consumption of the power-receiving device that leaves
a margin.
If a value smaller than the minimum power consumption required by the power-receiving
device is set manually, a power overload is detected and power to the power-receiving
device might stop. To restore power, execute the
command.
(2) Use on priority of powered port
If you set the
priority setting by the
ports are recognized merely as the ports for which power is to be supplied. If the
inline never
After the Switch restarts, it starts power supply from port 0/1 on in order. Therefore, if the
Trigger of status transition
shutdown
The
configuration command is set.
activate power inline
The
command is executed.
A PD is disconnected.
A PD is connected.
is displayed as the port status, power supply to the relevant port is stopped.
is displayed as the port status, which means power supply of the entire
operation command to check the amount of power allocated to
power inline priority-control disable
power inline
configuration command is set, power is not supplied.
operation
activate power inline
activate power inline
configuration command, the
configuration command is disabled, and the relevant
13 Ethernet
Port status after
transition
off
off (when no PD is
connected)
on (when a PD is
connected)
inact
denied
operation
power
207