MacDon M2170 Unloading And Assembly Instructions page 191

Windrower
Hide thumbs Also See for M2170:
Table of Contents

Advertisement

9. Connect main header harness (A) to adapter harness (B).
10. For headers equipped with the electric baffle control kit,
connect electric baffle control harness (C) to adapter
harness (D).
11. For grass seed headers (GSS), connect actuator harness (C)
to adapter harness (D).
12. Push latch (A) to unlock platform (B).
13. Pull platform (A) toward the cab until it stops and the latch
is engaged.
DANGER
Ensure that all bystanders have cleared the area.
262175
ATTACHING HEADERS TO WINDROWER
183
C
A
Figure 5.189: Electrical Harness Connection at
Center-Link
B
Figure 5.190: Left Platform
Figure 5.191: Left Platform
B
D
A
1015478
A
Revision A

Advertisement

Table of Contents
loading

This manual is also suitable for:

M2260

Table of Contents