Procedure 10-7 Verifying Dc Distribution Shelf Alarms - Nortel SONET AccessNode 800A Series Manual

Outside plant cabinet installation
Table of Contents

Advertisement

10-24 Adjusting the rectifier and the dc distribution shelf
Procedure 10-7 (continued)
Verifying dc distribution shelf alarms
Action
Step
1
2
3
4
5
6
7
8
9
Figure 10-5
NT6C14JC DC distribution shelf faceplate
EQL
OFF
SENSE
EQL
ON
RFA MAJ
RFA MIN
FA
1-1/3A
NORM
BYP
LVD ADJ
LVD ALM
CAUTION/ATTENTION
TST ADJ
FOR CONTINUED PROTECTION AGAINST
TST BYP
RISK OF FIRE REPLACE ONLY WITH
LVDR
SAME TYPE AND RATING OF FUSE.
LV ALM
POUR EVITER TOUT RISQUE D'INCENDIE
LV ADJ
REMPLACER LES FUSIBLES PAR DES
1
FUSIBLES DU MEME TYPE ET CALIBRE
SEN
6
BAT GRD
-48V
AccessNode 323-3001-210 Issue 1.0
Action
Ensure that all of the circuit breakers on the BIP are turned to the OFF
position.
Turn all circuit breakers on the dc distribution shelf to the ON position (see
Figure 10-5 on page 10-24).
Record the voltage displayed on the faceplate readout.
Confirm that the FA alarm indicator is extinguished.
Turn OFF CB1 on the dc distribution shelf to verify that the FA alarm LED
illuminates red.
Turn CB1 back ON to verify that the FA alarm LED extinguishes.
Turn OFF, then ON, each of the circuit breakers, one at a time, to verify that
the FA indicator illuminates and extinguishes with each breaker trip.
Turn all breakers back to the OFF position.
Turn ON the EQL switch on the dc distribution shelf to verify that the EQL
indicator illuminates yellow and that the voltage level displayed on the
faceplate display corresponds to the EQL level (-55.5 ± 0.1) set on the
rectifiers.
MBP DIST
NT6C14JA
REL-XXX
VOLTS
SER-XXX
AMPS
CB1 2
3
—continued—
CAUTION/ATTENTION
VOLTS/AMPS
INTENDED FOR INSTALLATION IN
LOCATION ACCESSIBLE ONLY TO
QUALIFIED PERSONS.
HAZARDOUS VOLTAGES INSIDE.
TO BE HANDLED BY A QUALIFIED
PERSON ONLY.
4
5
6 CB7
FW-11100
FW-11100

Advertisement

Table of Contents
loading

Table of Contents