Verifying The Site Requirements - Nortel Business Communications Manager 450 Installation Manual

Hide thumbs Also See for Business Communications Manager 450:
Table of Contents

Advertisement

18 BCM450 installation preparation
BCM450 installation preparation procedures
Figure 2
BCM450 installation preparation navigation
Verifying the site requirements (page 18)
Verifying the main unit components (page 19)
Verifying the expansion cabinet components (page 19)
Preinstallation checklists (page 20)

Verifying the site requirements

Before you install the BCM450 system, verify that your site meets the
installation requirements.
Prerequisites
For details about environmental, electrical, and telephony-wiring
requirements, see
Procedure steps
Step
1
Copyright © 2006-2009 Nortel Networks
Preinstallation reference (page
Action
Determine the location for the main unit (and optional expansion
cabinet), telephones, and other equipment.
Nortel Business Communications Manager 450 1.0
Installation — System
NN40160-301 01.04 Standard
July 2009
103).