Nortel SONET AccessNode 800A Series Manual page 298

Outside plant cabinet installation
Table of Contents

Advertisement

12-6 Cabinet maintenance operations
Procedure 12-1
Replacing the batteries
Use this procedure to replace batteries in an S800A cabinet that is currently
carrying traffic.
If the batteries that are to be replaced are installed in a new installation or in a
cabinet that is not in-service, see Chapter 9, "Installing and connecting the
batteries" for battery installation.
Battery strings 1-12 will provide at least eight hours of battery back-up for a
fully configured S800A system. Battery strings 13 and 14 may be used to
provide additional battery back-up power.
The batteries require replacement:
Requirements
The S800A system must be operating normally on rectifier power.
Test sets
A voltmeter RMS Fluke 8050A (or equivalent) test set is needed.
Tools required
A screwdriver, slotted, small (0.1-inch width) is required.
Documentation references
See NTP 169-2071-500.
AccessNode 323-3001-210 Issue 1.0
when an LVA alarm is generated significantly early (prior to eight hours)
in the battery back-up mode
during battery maintenance activities when the battery voltage is checked
and deemed to low
as listed in the battery manufacturer's maintenance requirements
—continued—

Advertisement

Table of Contents
loading

Table of Contents