Cabinet maintenance operations

This section provides installation procedures for the cabinet maintenance
operations for the S800A cabinet.
All maintenance procedures on the cabinet should be performed by the
operating company's maintenance crews or by contractor personnel.
Some procedures may be service affecting and should only be performed
during low traffic hours.
Table 12-1 on page 12-3 lists the cabinet parts that require regular maintenance
and gives a suggested schedule for performing these operations.
Table 12-2 on page 12-5 lists the replacement part numbers for the Series
800A cabinet. All part numbers apply to cabinets equipped with either the heat
exchanger or air induction roof options unless otherwise noted.
Read the following caution before performing this procedure:

How to use this chapter

In the following table, you will find a list of the procedures for performing
in-service maintenance activities on the S800A cabinet. Perform the
procedures in the order listed. If you cannot successfully complete these
procedures, contact your next level of support.
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Note: Cabinet alarms in the Series 800A cabinet are displayed at the
AccessNode inside the cabinet and transmitted to the central office.
CAUTION
Fire hazard
Before closing the cabinet, remove all paper and any other
combustible materials from inside the cabinet after any
maintenance operation is completed.
Failure to comply with this warning could result in a fire.