Nortel SONET AccessNode 800A Series Manual page 388

Outside plant cabinet installation
Table of Contents

Advertisement

13-30 Cabinet and equipment wiring and cabling
Figure 13-20
BIP dc power distribution feeds 3 and 4
From
DC distribution
shelf
BIP 3
-48V, 30A
BIP 3
(BR)
BIP 4
(BR)
BIP 4
-48V, 30A
AccessNode 323-3001-210 Issue 1.0
BIP
10A
Batt 3
1 mH
1A
10A
0.04 F
10A
10A
Ret 3
Ret 4
10A
0.04 F
10A
1 mH
10A
10A
15A
Batt 4
FW-15185
1
-
CU A TB
batt and ret to
2
+
cooling unit plane A
1
-
P/O VE 1 connector,
2
+
CE talk battery for
TAC and IMC.
1
-
CDS 2 TB
2
talk batt and ret.
+
1
-
CDS 4 TB
2
talk batt and ret.
+
1
-
CDS 6 TB
talk batt and ret.
+
2
1
-
CU B TB
batt and ret to
2
+
cooling unit plane B
-
1
CDS 1 TB
+
2
talk batt and ret.
1
-
CDS 3 TB
+
2
talk batt and ret.
1
-
CDS 5 TB
+
2
talk batt and ret.
1
-
CDS 7 TB
talk batt and ret.
+
2
FW-15185

Advertisement

Table of Contents
loading

Table of Contents