Nortel SONET AccessNode 800A Series Manual page 211

Outside plant cabinet installation
Table of Contents

Advertisement

Procedure 7-4 (continued)
Routing fiber to the ABM when no FPP is installed
Step
11
Figure 7-23
Routing the fibers into the ABM shelf swing frame
Swing frame
cabling cutout
OSP patch
cords or
pigtails
in split
flex tubing
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Action
Route the tubing through the swing frame cabling cutout on the hinge side of
the swing frame to the front of the ABM shelf as shown in Figure 7-23.
Note: Leave a sufficient service loop in the routing to accommodate the swing
fame opening and closing without putting undue pressure or tension on the
tubing.
—continued—
Routing and splicing the fiber cable 7-41
FW-15147
ABM
shelf
FW-15147
Swing frame

Advertisement

Table of Contents
loading

Table of Contents