Nortel SONET AccessNode 800A Series Manual page 86

Outside plant cabinet installation
Table of Contents

Advertisement

3-8 Connecting commercial power
Procedure 3-2 (continued)
Wiring the ac load box as a branch circuit
Action
Step
1
2
3
4
5
6
7
8
9
Table 3-4
AC voltage verification
AC input
230 Vac
115 Vac
115 Vac
10
AccessNode 323-3001-210 Issue 1.0
Action
CAUTION
Fire hazard
Remove all paper and any other combustible materials
from inside the cabinet before the cabinet is powered up.
Failure to comply with this warning could result in a fire.
Turn all circuit breakers in the ac load box to the OFF position.
Route the power and ground cabling from the external power source through
approved conduit into the 2-inch conduit the bottom of the ac compartment.
Note: Reference local codes and NEC guidelines for branch circuit
installation requirements.
Punch out an appropriate sized knockout on the left side of the load box for
strain relief or conduit installation.
Route the wires into the load box through the appropriate strain relief or
conduit.
Connect wires to the main lug L1 and L2 terminators, GND, and NEUTRAL
located at the load box chassis assembly (see Figure 3-1).
Disconnect and remove the cabinet load box main bonding jumper.
Note: The redundant main bonding jumper is not required per NEC with
external power pedestal or service disconnect.
Remove the neutral bonding screw in the cabinet ac load box panel.
Turn the commercial ac power feed to the ON position.
Use a voltmeter to verify power measurements listed in Table 3-4.
If branch circuit
L1 bar to L2 bar
L1 bar to N bar
L2 bar to N bar
Reinstall all cover panels and tightly secure.
—continued—
If main service entrance
L1 to L2 on main breaker
L1 main breaker to neutral bar
L2 main breaker to neutral bar