Nortel SONET AccessNode 800A Series Manual page 209

Outside plant cabinet installation
Table of Contents

Advertisement

Procedure 7-4 (continued)
Routing fiber to the ABM when no FPP is installed
Step
6
7
Figure 7-20
Tie wrap the fiber cable to the ceiling of the heat exchanger roof assembly
Rear
Left inside view
Figure 7-21
Tie wrap the fiber cable to the ceiling of the air induction roof assembly
Rear
Left inside view
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Action
Route tubing across the ceiling of the cabinet as per the type of roof assembly
on the rear side of the air baffle (see Figure 7-20 or Figure 7-21).
Note 1: For the heat exchanger roof, route the fiber inside the V-baffle
enclosure (see Figure 7-20).
Note 2: The air induction roof has a cable hooks for all cable routing (see
Figure 7-21).
Tie wrap the fiber cable to the cabinet ceiling as per the type of roof assembly.
ABM
Front
AC
Swing frame cutout
ABM
Swing frame cutout
Front
AC
—continued—
Routing and splicing the fiber cable 7-39
FW-15144
Rear view
Plastic cable duct
Rear view
FW-15144
V- trough
Maintain at least
minimum bend
radius
3.0 in. (76 mm)
Fiber patch cords
Service loop
Termination
FW-15145
FW-15145
Maintain at least
minimum bend
radius
of 3.0 in. (76 mm)
Fiber patch cords
Service loop
Termination

Advertisement

Table of Contents
loading

Table of Contents