Nortel SONET AccessNode 800A Series Manual page 237

Outside plant cabinet installation
Table of Contents

Advertisement

Procedure 9-2 (continued)
Installing 6 V batteries in a cabinet
Action
Step
1
Table 9-7
Battery string circuit breaker assignments for 6 V batteries
If quantity of battery strings
(minimum of three) you are
installing is
3
4
5
6
7
2
Table 9-8
6 V battery voltage check requirements
If the battery type is
Eagle-Picher, 6 V dc
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Action
Turn the battery breaker panel (BBP) circuit breakers to the OFF position for
the battery strings to be installed (see Table 9-7).
Measure the voltage between the terminals of each new battery pack (see
Table 9-8).
—continued—
Installing and connecting the batteries 9-15
Then turn these BBP circuit breakers to the
OFF position
BATT 1-2, BATT 3-4, BATT 5-6
BATT 1-2, BATT 3-4, BATT 5-6, BATT 7-8
BATT 1-2, BATT 3-4, BATT 5-6, BATT 7-8,
BATT 9-10
BATT 1-2, BATT 3-4, BATT 5-6, BATT 7-8,
BATT 9-10, BATT 11-12
BATT 1-2, BATT 3-4, BATT 5-6, BATT 7-8,
BATT 9-10, BATT 11-12, BATT 13-14
Then the voltage reading must be
≥ 5.75 V dc on each 6 V battery