Nortel SONET AccessNode 800A Series Manual page 63

Outside plant cabinet installation
Table of Contents

Advertisement

Installing the cabinet 2-19
Procedure 2-3 (continued)
Preparing the cabinet for installation
Figure 2-7
Lifting sling (load) orientation to eyebolts
FW-16367
Lifting eyebolt
FW-16367
Top view of cabinet
Lifting sling
(Load)
Correct
Incorrect
—continued—
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0