Nortel SONET AccessNode 800A Series Manual page 179

Outside plant cabinet installation
Table of Contents

Advertisement

Procedure 7-1 (continued)
Routing the OSP fiber cable directly to the FPP
Figure 7-2
Tie wrap the fiber cable to the ceiling of the heat exchanger roof assembly
Rear
Left inside view
Figure 7-3
Tie wrap the fiber cable to the ceiling of the air induction roof assembly
Rear
Left inside view
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Front
AC
Thermostat
Thermostat
Front
AC
—continued—
Routing and splicing the fiber cable 7-9
FW-15127
FPP
Rear view
Cable rings
FPP
Rear view
FW-15127
V- trough
Maintain at least
minimum bend
radius
3.0 in. (76 mm)
OSP fiber cable
Termination
FW-15128
FW-15128
Maintain at least
minimum bend
radius
of 3.0 in. (76 mm)
OSP fiber cable
Termination

Advertisement

Table of Contents
loading

Table of Contents