Nortel SONET AccessNode 800A Series Manual page 210

Outside plant cabinet installation
Table of Contents

Advertisement

7-40 Routing and splicing the fiber cable
Procedure 7-4 (continued)
Routing fiber to the ABM when no FPP is installed
Step
8
9
10
Figure 7-22
Routing the fibers down the inside wall of the AC compartment
DSX
RPTR
Battery breaker
panel
Rear
DC distribution
shelf
Rectifier
shelf
Left rear equipment
swing frame open
AccessNode 323-3001-210 Issue 1.0
Action
Route the tubing down the inside wall of the AC compartment as shown in
Figure 7-22.
Route the tubing to the front side of the baffle.
Route the tubing to the rear of the ABM shelf in the front right swing frame.
Inside view facing AC compartment
—continued—
FW-15146
Front
Right front equipment
swing frame open
FW-15146
Route the split flex
tubing against
the tie-down strip when
routing to the ABM.
Form the service loop
before entering the swing
frame cabling cutout

Advertisement

Table of Contents
loading

Table of Contents