Nortel SONET AccessNode 800A Series Manual page 165

Outside plant cabinet installation
Table of Contents

Advertisement

Procedure 6-8 (continued)
Connecting the outside plant cable pairs to 710 or 3M MS2 DPM connectors without
cross-connect
Step
7
Table 6-3
Terminating connector options
If you are connecting
3M connectors
710 connectors to 710
capless connectors
710 connectors to a
bridging connector
8
9
10
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Action
Perform the steps shown in Table 6-3 as per the specific type of connectors
that you are working with.
Note: Leave enough excess length so the connector assemblies can be
folded and returned to their original positions.
Then perform these steps
• Terminate each 25-pair binder group directly onto
the corresponding 3M connectors (see Table 6-4).
• Go to step 8.
• Terminate each 25-pair binder group directly onto
the corresponding 710 connectors capless
connectors provided (see Table 6-4).
• Attach the cap.
• Go to step 8.
• Terminate onto a bridge connector and mate with
the spliced connector (see Table 6-4).
• Fan out pairs.
• Go to step 8.
Tie off the binder group with its proper connector coming from the S800A
S/DMS AccessNode copper-distribution shelf to the inside left wall ladder
supports.
Attach each 25-pair binder group to the corresponding ladder position.
Tie wrap as needed along both left side ladder supports (see Figure 6-19 on
page 6-42).
Note: When tie wrapping, make sure the pairs are resting on top of the S800A
S/DMS AccessNode copper-distribution shelf cables. Keep the pairs off the
metal. Take care not to bind the pairs too tight; you should be able to turn the
ties once they are wrapped.
—continued—
Routing and terminating the VF cables 6-39

Advertisement

Table of Contents
loading

Table of Contents