Procedure - Nortel SONET AccessNode 800A Series Manual

Outside plant cabinet installation
Table of Contents

Advertisement

9-26 Installing and connecting the batteries

Procedure 9-3

Wiring the cabinet when the batteries are installed in
the battery vault
Use this procedure to connect batteries to the NT1W00DA/EA/FA cabinets
when the batteries are mounted in the NT1W52 battery vault.
Requirements
This procedure requires the following equipment:
Action
Step
1
2
AccessNode 323-3001-210 Issue 1.0
Note: Customers define the types of batteries to be installed and the battery
mounting procedures for installing batteries in the vault. They may differ
with each installation.
voltmeter RMS Fluke 8050A (or equivalent)
wire stripper for 6 AWG cable
terminal lug crimping tool for 6 AWG terminal lugs
Action
Turn the battery circuit breakers in the battery vault to the OFF position.
Route the battery cables from the vault into the cabinet to TB13 as shown in
Figure 9-13 on page 9-27.
—continued—