Procedure 6-5 (continued)
Connecting the VF cable pairs 601–1200 to 710 or 3M MS2 DPM connectors with cross-connect
Figure 6-14
Tie wrap groups on top of existing cable
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Routing and terminating the VF cables 6-29
Route and tie wrap groups
on top of existing cable
—end—