Installing And Connecting The Batteries; Chapter Task List; Prerequisites For Installation - Nortel SONET AccessNode 800A Series Manual

Outside plant cabinet installation
Table of Contents

Advertisement

Installing and connecting the
This chapter describes how to install and wire batteries for the Series 800A
(S800A) cabinet. The batteries can be mounted in the S800A cabinet or inside
an in-pad battery vault.
The batteries are valve-regulated lead-acid cells equipped with plug-in
connectors for easy installation and maintenance. They can deliver eight hours
of battery reserve power at up to 350 amp-hours (Ah). See Chapter 13,
"Cabinet and equipment wiring and cabling," for more information.

Chapter task list

This chapter contains the following procedures:
Task
Installing 12 V batteries in a cabinet
Installing 6 V batteries in a cabinet
Wiring the cabinet when the batteries are
installed in the battery vault

Prerequisites for installation

The choice of site and compliance with local regulations (such as the
applicable electrical codes, right-of-way easements, and noise requirements)
are the responsibility of the operating company. Before you install batteries,
make sure the following conditions have been met:
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Note: If you cannot successfully complete a procedure, contact your next
level of support.
The cabinet has been mounted on a concrete pad or vault as defined in
Chapter 2, "Installing the cabinet."
All hardware and materials are available and ready for the installation.
All required drawings, local installation instructions, job specifications,
and other documentation are available and ready for use.
batteries9-
See
Procedure 9-1 on page 9-4
Procedure 9-2 on page 9-14
Procedure 9-3 on page 9-26
9-1

Advertisement

Table of Contents
loading

Table of Contents