Procedure 7-3 (continued)
Routing the OSP fibers in split flex tubing to the FPP
Step
25
26
27
28
29
30
Figure 7-18
Routing the patch cords in the fiber trays of the FPP
Patch cords
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Action
Route the tubing and patch cords into the cable tie strap.
Secure the tubing into the tie strap.
Route the patch cords into the fiber trays as shown in Figure 7-18.
Note: Form the patch cords in the fiber management system as per the
manufacturer's recommendations if you are using a system other than the
FPP.
Connect the patch cord connectors to the FPP.
Connect the patch cords to the OC-3 and OC-12 cards in the ABM shelf.
Close the ABM shelf.
Fiber patch panel
Rear
—end—
Routing and splicing the fiber cable 7-31
FW-15142
FW-15142