Nortel SONET AccessNode 800A Series Manual page 199

Outside plant cabinet installation
Table of Contents

Advertisement

Procedure 7-3 (continued)
Routing the OSP fibers in split flex tubing to the FPP
Step
16
17
18
19
20
21
Figure 7-16
Routing the patch cords down the inside termination compartment wall
CDS 5
CDS 4
CDS 3
Rear
CDS 2
CDS 1
Inside view facing termination compartment with swing frames open
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Action
Route the tubing down the inside wall of the termination compartment as
shown in Figure 7-16.
Ensure that the right rear swing frame with the FPP panel installed is in the
fully open position.
Form a service loop in the tubing as shown in Figure 7-16.
Route the tubing to the top of the swing frame.
Form the tubing across the back of the swing frame to the other side of the
FPP.
Secure the tubing with tie wraps to the top of the swing frame.
Batteries of floor
of cabinet
—continued—
Routing and splicing the fiber cable 7-29
Plastic cable duct
FW-15140
Gently tie wrap the
split tubing to the
cable tie strips when
Fiber patch panel
routing to the FPP.
Use split tubing
for routing fibers
Battery
(route as shown).
shelf
Battery
Front
shelf
Battery
shelf
Battery
shelf
FW-15140