Advertisement

Procedure 7-1 (continued)
Routing the OSP fiber cable directly to the FPP
Step
12
13
14
15
16
Figure 7-7
Fiber cable tie strap in the FPP
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Action
Tie wrap the cable to the strip on the inner side of the swing frame to within
6 inches (15.4 cm) of the bonding and grounding bracket.
Form the ground lead into the bonding and grounding bracket (see Figure 7-6
on page 7-12).
Tighten all of the bracket connections to secure the cable and ground lead.
Route the buffer tubing with the fibers inside into the FPP at the fiber entry
hole on the side of the panel (see Figure 7-6 on page 7-12).
Note: Maintain at least the minimum bend radius (3.0 inches/76 mm).
Secure the buffer tubing with the fibers inside in the FPP at the cable tie strap
located in the inside right rear of the FPP (see Figure 7-7).
OSP fiber cable
—continued—
Routing and splicing the fiber cable 7-13
FW-15132
Splices
Fiber patch panel
FW-15132