7-4 Routing and splicing the fiber cable

Cable entry

The S800A cabinet is constructed with cable conduit entry ports located at the
bottom of the end compartments of the cabinet.
Termination compartment
Table 7-1 shows where the fiber cabling has been pulled into the termination
compartment (see Chapter 4, "Installing the OSP cables") and how much slack
has been pulled for cable routing.
Table 7-1
OSP cable entry locations and lengths
When you pull cable for
VF cable pairs 1–600
VF cable pairs 601–1200
VF or miscellaneous pairs
T1 distribution or maintenance pairs
Fiber
AccessNode 323-3001-210 Issue 1.0
Into the termination
compartment
conduit opening at
this location
far left
middle left
middle right
middle right
far right
Then leave this
amount of
cable for
routing
10 ft (3.1 m)
12 ft (3.7 m)
25 ft (7.6 m)
5 ft (1.5 m)
25 ft (7.6 m)