Nortel SONET AccessNode 800A Series Manual page 234

Outside plant cabinet installation
Table of Contents

Advertisement

9-12 Installing and connecting the batteries
Procedure 9-1 (continued)
Installing 12 V batteries in a cabinet
Step
11
Figure 9-5
12 V battery cable routing
Rear left
swing frame
open
DSX-1
RPTR 1
RPTR 2
TB4
Battery interface
connector field
NT1W64AA
AccessNode 323-3001-210 Issue 1.0
Action
Route, but do not connect, the BBP ends of the battery cables to the battery
interface connector field on the rear left swing frame. Secure the cables to the
swing frame with tie wraps (see Figure 9-5).
HENDRY
View facing AC compartment
—continued—
Batteries on floor
of cabinet
View facing termination compartment
Rear right
swing frame
open
FW-15156
14
14
13
12
12
11
11
9
9
FW-15156

Advertisement

Table of Contents
loading

Table of Contents