11-4 Finishing the S800A cabinet installation procedures
Procedure 11-1 (continued)
Installing the protector modules
Step
5
6
7
8
9
10
11
12
13
AccessNode 323-3001-210 Issue 1.0
Action
Plug in all the protectors as per the customer configuration required
(see Figure 11-1 on page 11-5).
Note: If the cross-connect wiring has been completed or is planned to be
completed prior to powering the CDS shelves (installing batteries and
powering the rectifiers), only install the protector modules up to the first detent
position so that the equipment is not connected to the OSP cable and the
OSP cable is protected. Otherwise, you can plug the modules completely into
the block positions.
Close the SPC cover.
Tighten the thumbscrews.
Unlatch the swing frame (if installed).
Carefully close the swing frame.
Fasten the frame in place using the top and bottom latches.
CAUTION
Fire Hazard
Before closing the cabinet, remove all paper and any other
combustible materials from inside the cabinet after any
maintenance operation is completed.
Failure to comply with this warning could result in a fire.
Release the termination compartment door restrainer rod.
Close the termination compartment door.
Continue the S800A cabinet installation according to the following:
If the commissioning and
testing is to be done
Now
At some later date
—continued—
Then
go to Procedure 11-2, "Performing
commissioning and site testing" on
page 11-6 and then perform Procedure 11-3,
"Installing the shipping brackets" on
page 11-7
go to Procedure 11-3, "Installing the shipping
brackets" on page 11-7