Nortel SONET AccessNode 800A Series Manual page 275

Outside plant cabinet installation
Table of Contents

Advertisement

Procedure 10-7
Verifying dc distribution shelf alarms
Use this procedure to:
The Series 800A cabinet accommodates up to three NT5C06CA-3 25 amp
rectifier modules mounted in the NT5C10CE rectifier shelf.
This procedure applies to a system that is equipped with one, two, or three
rectifier modules.
Documentation
See NTP 169-9051-100.
Test sets
A voltmeter RMS Fluke 8050A (or equivalent) test set is needed.
Tools required
A screwdriver, slotted, small (0.1-inch width) is required.
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
perform the alarm verification on the NT6C14JC dc distribution shelf
prepare for the low voltage disconnect adjustment procedures for all
rectifiers in the cabinet
Note: If the unit fails, return it to the nearest Nortel Networks Repair and
Return facility.
Adjusting the rectifier and the dc distribution shelf 10-23
—continued—

Advertisement

Table of Contents
loading

Table of Contents