Nortel SONET AccessNode 800A Series Manual page 123

Outside plant cabinet installation
Table of Contents

Advertisement

Procedure 5-1 (continued)
Routing and terminating OSP T1 and maintenance pairs
Figure 5-1
Terminate T1 pairs to BIX connectors (with or without the cross connect)
Route and tie wrap T1 pairs
under the bottom SPC modules
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Routing and terminating OSP T1 and maintenance pairs 5-5
Completed T1 terminations
—continued—