Nortel SONET AccessNode 800A Series Manual page 56

Outside plant cabinet installation
Table of Contents

Advertisement

2-12 Installing the cabinet
Procedure 2-2 (continued)
Preparing the pad
Step
3
4
5
6
7
Table 2-5
Pad/sealant kit (P0738444)
QTY
P0738460
middle
Pad
sections
P0729558
2
P0729559
2
P0729560
2
P0729561
2
AccessNode 323-3001-210 Issue 1.0
Action
Remove and save the plastic cap plugs, nuts, washers and support angles
from the anchoring bolts on the mounting pad.
Clear the pad of any debris and make sure that the pad is level and free of
obstructions.
CAUTION
Install the anchor plate sealant kit
The anchor plate sealant kit must be installed before the
cabinet is lifted onto the mounting pad. Improper
installation of the sealant kit may result in galvanic
corrosion damage to the cabinet
Place the appropriate sealant kit pieces (see Table 2-5 and Figure 2-5) from
anchor plate sealant kit into position on the pad after removing the paper
backing.
Ensure that all sealant kit cutouts are aligned with the pad conduits and that
each piece lies flat on the pad with no wrinkling or folded edges.
Note: Middle section sealant pieces must be placed with the untreated edge
(the paper lip having no sealant material attached) toward the outside edge
of the pad so that the treated edges butt up against each other in the center
of the pad.
Reinstall the red protective cap plugs on the cabinet anchor bolts in the
concrete pad.
QTY
P0738461
ac side
sections
1
—continued—
.
QTY
QTY
P0738462
P0738463
ac side
termination side
sections
sections
1
1
1
1
1
1
1

Advertisement

Table of Contents
loading

Table of Contents