Nortel SONET AccessNode 800A Series Manual page 124

Outside plant cabinet installation
Table of Contents

Advertisement

5-6 Routing and terminating OSP T1 and maintenance pairs
Procedure 5-1 (continued)
Routing and terminating OSP T1 and maintenance pairs
Figure 5-2
Terminate T1 pairs to 710 or 3M connectors (without the cross connect)
AccessNode 323-3001-210 Issue 1.0
Route and tie wrap
parallel to P21/P22 cable
Completed
terminations
—continued—
Form T1 pairs to back wall
(right side) cable ladder