Nortel SONET AccessNode 800A Series Manual page 152

Outside plant cabinet installation
Table of Contents

Advertisement

6-26 Routing and terminating the VF cables
Procedure 6-5 (continued)
Connecting the VF cable pairs 601–1200 to 710 or 3M MS2 DPM connectors with cross-connect
Step
1
2
3
4
5
6
7
8
9
10
11
AccessNode 323-3001-210 Issue 1.0
Action
Route and dress the column 3 binder groups from the top of the outside plant
compartment to the bottom.
Note: Follow the binder group order in Table 6-2 on page 6-24.
Separate the appropriate binder group (per Table 6-2 on page 6-24) at each
of the two cable ladder bars on the left side of the compartment.
Note: Always place one tie wrap above and one below the binder group that
is being separated from the cable.
Extend the cables across the horizontal swing frame support bars (see
Figure 6-12 on page 6-27).
Continue to secure the remaining column 3 binder groups up the cable ladder
(see Figure 6-13 on page 6-28).
Extend the cables across the cable support bars and attach them to the first
cabinet support bar using a tie wrap (see Figure 6-12 on page 6-27).
Route and tie wrap the column 3 binder groups on top of the existing cable
(see Figure 6-14 on page 6-29).
Form the cables so they will compress on the ladder rung when tie wrapped.
Note: Be sure to maintain about 6
the swing frame.
Position Column 2 connectors above and below the support bar.
Route Column 3 binder group against the support bar.
Secure both connectors and the column 3 binder groups in this position.
Repeat all previous steps in this section until the last column 3 binder group
has been separated from the 600-pair cable and routed to its respective
position on the horizontal support bar (violet/ brown).