ABB RELION 670 Series Technical Manual page 1117

Generator protection
Hide thumbs Also See for RELION 670 Series:
Table of Contents

Advertisement

1MRK 502 066-UUS B
tEnergyOffPls
EAFACC
1000 GWh
EAFAccPlsQty
RSTACC
tEnergyOnPls
-1
q
= unit delay
IEC13000188 V5 EN-US
Figure 580: Logic for pulse generation of integrated active forward energy
The maximum demand values for active and reactive power are calculated for the set time interval
tEnergy . The maximum values are updated every minute and stored in a register available over
communication and from outputs MAXPAFD, MAXPARD, MAXPRFD and MAXPRRD for the active and
reactive power forward and reverse direction. When the RSTDMD input is active from the local HMI
reset menu, these outputs are reset to zero. The energy alarm is activated once the periodic
energy value crosses the energy limit
energy exceeds limit and Maximum forward active power demand value. Similarly, the maximum
power calculation and energy alarm outputs in the active reverse, reactive forward and reactive
reverse is implemented.
P (ACTIVE FORWARD)
tEnergy
EALim
RSTMAXD
-1
q
= unit delay
IEC13000189 V4 EN-US
Figure 581: Logic for maximum power demand calculation and energy alarm
Technical manual
Counter
a
a>b
CU
b
CV
Rst
-1
R
I
q
÷
X
R
I
÷
Counter
CU
CV
Rst
-1
q
ExLim .
Average Power
X
Calculation
-1
q
tOff
t
0
T
a
a>b
F
b
0
Figure 581
shows the logic of alarm for active forward
a
a>b
b
0.0
T
MAX
F
-1
q
Section 17
Metering
EAFPULSE
TP
IEC13000188-5-en.vsdx
EAFALM
MAXPAFD
IEC13000189-4-en.vsd
1111