Os Installation And Project Data Transfer From The Cf Card To Got - Mitsubishi Electric C70 Setup Manual

Hide thumbs Also See for C70:
Table of Contents

Advertisement

2.2.6.2 OS Installation and Project Data Transfer from the CF Card to GOT

Install the standard monitor OS and so on and transfer the data from the CF card.
(1) Turn the GOT OFF and set "OFF" the CF card access switch on the back of GOT. Insert the CF card which
contains the data into the slot, and set the CF access switch to "ON".
(2) Keep touching the GOT screen's left top and bottom during turning ON.
When using GT1595-X or GT16, keep pressing the installation switch (S.MODE switch) on the back of the GOT
during turning the GOT ON.
The data in the CF card is transferred to the GOT.
(3) The GOT automatically restarts after the data transfer. (If the standard monitor OS has already been installed,
touching the button will restart the GOT.)
(4) Confirm that the GOT is successfully restarted, and set the GOT's CF card access switch to "OFF". Confirm that
the CF card access LED is OFF, and remove the CF card from the GOT's CF card interface.
(Note)
For details, refer to the "GT Designer2 Version2 Basic Operation/Data Transfer Manual" (SH(NA)-080529),
Section 8.
OFF
ON
or
CF card
OFF
Installation switch
(S.MODE)
C70 Setup Manual
2.2 GT Designer2
ON
55

Advertisement

Table of Contents
loading

Table of Contents