Writing The Package Data To Got - Mitsubishi Electric C80 Series Connection And Set Up Manual

Hide thumbs Also See for C80 Series:
Table of Contents

Advertisement

C80 Series Connection and Setup Manual
9 GOT Initial Setup

9.1.6 Writing the Package Data to GOT

Transferring the package data (project, system application such as the basic function and the extended function, and the
communication driver) to the GOT.
This chapter explains the procedures to transfer the data from the computer to the GOT using a USB cable.
For other data transfers using the data storage such as an SD card or a USB memory, refer to Chapter 4 in "GT
Designer3 (GOT2000) Screen Design Manual" (SH(NA)-081220).
GT Designer3
(1) Turn ON the GOT, start GT Designer3 on the personal computer, and select [Communication]-[Communication
Configuration...] from the menu bar.
(Note) At starting GT Designer3, if the "New Project Wizard" dialog box appears, close the dialog box.
IB-1501452-C
USB
GT09-C30USB-5P
128
GOT2000 Series
(SVGA,VGA)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents