Flow Of The Initial Setup - Mitsubishi Electric C70 Setup Manual

Hide thumbs Also See for C70:
Table of Contents

Advertisement

1.2 Flow of the Initial Setup

The following shows the overall flow of the initial setup.
Refer to the following chapters for setting the machine control functions.
- Setting the Position Detection System
- Deceleration Check
- Setting the Tool Entry Prohibited Range
Start
Connecting the devices
GOT initial setup
Installing GT Designer3 / GT Designer2
Communication setting
Setting the destination drive for backup data
Transferring the data to GOT
PLC CPU initial setup
Transfer setup for GX Works2 / GX Developer
Setting multi-CPU parameters
CNC CPU initial setup
Initializing CNC CPU internal data
Setting multi-CPU parameters
Setting the date and time
CNC CPU initial setup
Setting CNC base parameters
Setting CNC axis parameters
Setting CNC servo parameters
Setting CNC spindle specification parameters
Setting CNC spindle parameters
Inputting ladder programs
Inputting GOT project
Refer to GT Designer3 / GT Designer2 manuals
End
1.2 Flow of the Initial Setup
Refer to chapter 2
Refer to chapter 3
Refer to chapter 4 and 5
Refer to chapter 6
C70 Setup Manual
3