Download Print this page
Mitsubishi Electric CB10 ME Quick Installation Manual
Mitsubishi Electric CB10 ME Quick Installation Manual

Mitsubishi Electric CB10 ME Quick Installation Manual

Advertisement

Quick Links

CB10 ME – Mitsubishi Electric
Quick Installation Guide
Need help? Phone MyTeam on 1300 850 191
19/10/2023

Advertisement

loading

Summary of Contents for Mitsubishi Electric CB10 ME

  • Page 1 CB10 ME – Mitsubishi Electric Quick Installation Guide Need help? Phone MyTeam on 1300 850 191 19/10/2023...
  • Page 2 At least 100Pa should be set for a zoned ducted system. 3. Switch off the power to the air conditioning system at the isolator. Leave it turned off. 4. Remove the Mitsubishi Electric wired remote control from system. 5. Connect integration cable from control box to indoor unit as follows:...
  • Page 3 • MyAir+ allows you to connect up to 4 indoor units together with one MyAir+ touch screen. • You need one CB10 ME per ME indoor unit. • Follow the MyAir+ installation instructions. • The Wall Mounted Touch Panel (TSPx) must be plugged into master Control Box (CB10 ME) .
  • Page 4 The screen will display a small green icon next to the zone name for a short time and also display ‘SENSOR PAIRED!’ when the process is completed. Press ‘next’ button to pair additional sensors. Step 5: After pairing all sensors please select save. The below screen will then show all zones and sensors that are paired.