MITSUBISHI CNC
5 Connecting and Setting up Multiple CNC CPU Modules
5.4 Switching the CNC Monitor Screen
Pressing "CNC Chg" switches the CNC CPU in the following order.
For Ethernet connection, the CNC CPU switches in the order that the data was set (from upper row on the Ethernet
screen written before) in the GT Designer3 / GT Designer2 project data.
For bus connection, the CNC CPU switches in the order of CPU No. (CPU#).
5.5 Setting Multi-CPU Parameters to CNC CPU
When connecting two CNC CPUs, there are two types of setting depending on the value to be set for the parameter
"#26742 G Device TOP number" of CPU#3.
(1) When setting the control signal of CPU#3 to G13072.
Set "6" to the parameter "#26701 CPU specific send range(K)" for CPU #1. Set the parameter for CPU#3 in the
same manner as CPU#2.
Setting up the 1st CNC CPU (CPU#2)
Apply the same settings to the 2nd CNC CPU.
However, set "13072" to the parameter "#26742 G Device TOP number".
Setting up the 2nd CNC CPU (CPU#3)
94
MULTI CPU PARAM.
DATA
EMG EMERGENCY M01 OPERATION ERROR
BASE
AXIS
MULTI CPU PARAM.
DATA
EMG EMERGENCY M01 OPERATION ERROR
AXIS
BASE
SETUP PARAM
MULTI
SERVO
SETUP PARAM
13072
MULTI
SERVO
MENU
MENU