Energy Star - Fujitsu PRIMERGY RX2530 M4 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX2530 M4:
Table of Contents

Advertisement

If the server is integrated into an installation that draws power from an
industrial power supply network with an IEC309 type connector, the
power supply's fuse protection must comply with the requirements for
non-industrial power supply networks for the type A connector.
Other important information
During cleaning, observe the instructions in the corresponding Operating
Manual chapter "Starting up and operation" > "Cleaning the server".
Keep all manuals close to the server. All documentation must be included if
the equipment is passed on to a third party.
3.2

ENERGY STAR

Products that have been certified compliant with ENERGY STAR
and labelled are in full compliance with the specification at
shipping. Note that energy consumption can be affected by
software that is installed or any changes that are made to the
hardware configuration or BIOS or energy options subsequently.
In such cases, the properties guaranteed by ENERGY STAR can
no longer be assured.
The "ServerView Operations Manager" user guide contains
instructions for reading out measurement values, including those
relating to current energy consumption and air temperatures.
Either the Performance Monitor or the Task Manager can be
used to read out CPU utilization levels.
RX2530 M4
Upgrade and Maintenance Manual
Important information
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents