Fujitsu PRIMERGY RX2530 M4 Upgrade And Maintenance Manual page 424

Hide thumbs Also See for PRIMERGY RX2530 M4:
Table of Contents

Advertisement

Appendix A
Pos. Label
Indicator
Power-on
5
indicator
AC
6
connected
indicator
424
Status
off
green on
flashing
green
slowly
green on
off
Upgrade and Maintenance Manual
Description
The server is switched off.
– The server has been switched on
but Power Cycle Delay settings
delay it from turning on for a
specified time.
– The server is switched on and
operating normally.
The BMC firmware is starting up after
the server has been connected to the
mains.
– The server is switched off and
connected to the mains (standby
mode).
– The server has been switched on
but Power Cycle Delay settings
delay it from turning on for a
specified time.
I
After connecting the server to
the mains, it will take about 60
seconds until the server will
enter standby mode and can
be switched on.
– The server is switched off and not
connected to the mains.
– The server is switched on and
operating normally.
RX2530 M4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents