Startup - Teledyne 100E Instruction Manual

Uv fluorescence so2 analyzer
Table of Contents

Advertisement

Getting Started

3.2.1. Startup

After electrical and pneumatic connections are made, turn on the instrument and pump
power. The exhaust and PMT cooler fans should start. The display should immediately
display a single, horizontal dash in the upper left corner of the display. This will last
approximately 30 seconds while the CPU loads the operating system.
Once the CPU has completed this activity it will begin loading the analyzer firmware and
configuration data. During this process, string of messages will appear on the analyzer's
front panel display:
SELECT START OR REMOTE
START
CHECKING FLASH STATUS
STARTING INSTRUMENT CODE
STARTING INSTRUMENT
M200E NOX ANALYZER
BOOT PROGRESS [XXXXX 50%_ _ _ _ _]
SOFTWARE REVISION C.2
BOOT PROGRESS [XXXXXXXX 80% _ _]
SAMPLE
TEST
CAL
36
W/FLASH
SYSTEM RESET
SO2=X.XXX
CLR SETUP
Press CLR to clear initial
warning messages.
(see Section 3.2.3)
Model 100E Instruction Manual
System waits 3 seconds
then automatically begins
:
3
its initialization routine.
No action required.
.
:
1
System is checking the format
of the instrument's flash
:
1
**FLASH FORMAT INVALID**
appears, contact T–API customer service
The instrument is loading
:
1
configuration and calibration
data from the flash chip
The instrument is
loading the analyzer
The revision level of the
firmware installed in your
analyzer is briefly displayed
Firmware
fully booted
memory chip.
If at this point,
firmware.
045150102 Rev XB1

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents